Traffic

Traffic Watch for July 12

MANATEE COUNTY

n Manatee Avenue West between 51st and 53rd streets west: Westbound right lane closures from 9 a.m. to 5 p.m. through July 16 for sidewalk repairs.

n U.S. 41 at 17th Street East, Palmetto: Intermittent lane closures in both direction from 9 a.m. to 4 p.m. through July 16 for intersection improvements.

n Interstate 75 from University Parkway to State Road 70: Possible lane closures through mid-July for guardrail and paving work.

n U.S. 301 at 13th Avenue: Intermittent lane closures from 6 p.m to 7 a.m. through mid-July for extending turn lanes, curb and gutter improvements and sidewalk modifications.

n State Road 62 from U.S. 301 to S.R. 37: Intermittent lane closures from 7 a.m. to 7 p.m. Mondays through Saturdays through July for milling, resurfacing, drainage improvements, construction of new shoulders, pavement, driveway rehabilitation, guardrail, and signing and pavement marking improvements.

n State Road 70 from west of Myakka-Wauchula Road to east of Sugarbowl Road: Expect possible delays through July for roadway striping.

n State Road 64/Manatee Avenue West between 39th and 59th streets west: Intermittent lane closures from 7 p.m. to 6 a.m. through October for highway lighting installation.

n North Bay Canal and Crescent Drive bridges, Anna Maria: No lane closures expected as bridge repairs continue.

n State Road 64 from east of Lena Road to west of Lakewood Ranch Boulevard: Expect night work, construction traffic and shifts in traffic patterns for road widening.

n State Road 64 between County Road 675 and Wingate Road: Lane closures, with workers directing one-way traffic, from 7 a.m. to 5:30 p.m. daily for drainage improvements and paving work.

n State Road 70 from Verna Bethany Road to two miles westward: Intermittent lane closures for roadside shoulder repairs.

n State Road 789 from Longboat Pass bridge to State Road 64: Intermittent lane closures from 8 a.m. to 5 p.m. weekdays for milling and resurfacing, shoulder work, curb and gutter installation and other improvements.

n U.S. 301 from Erie/Old Tampa roads to Rutland Road/County Road 675: Traffic switched to new southbound lanes between Old Tampa Road and Harrison Ranch Boulevard. Intermittent lane closures from 9 a.m. to 4 p.m. daily for roadway widening and drainage installation. Tiger Lilly Boulevard and 69th Street East closed at U.S. 301.

— Herald staff report

  Comments